However, on Internet it is already well documented but I am getting few requests to share the process which I followed to upgrade :) So, for those guys, who requested it. However, who haven't requested it still can take benefit out of it, if they want. LOL!
Here you go...
Pre-Checks
• Take a snapshot of the vROPS virtual appliance ( all cluster nodes including Master, Replica, Data and collector nodes)
• Make sure that you have different upgrade files for Operating system and Virtual appliance (vROPS), there is NO roll back when an upgrade fails. Need snapshot to revert it back.
• Enough free space available on the vROPS Master virtual machine.( df -h $STORAGE/db) , around 20-25% free space
Pre-Upgrade Steps-
In order to reduce the upgrade time, we need to copy the .pak files manually to all nodes except Master node.Note: If you do not pre-copy the PAK file to a node, the Software Update feature copies the PAK file to the node as usual when you finish the update using the administration interface
Below is the method to manually copy the .PAK files to nodes.
Step 1 -
Download the .PAK files to jump server (C:\Temp) from where VROPS server is accessible
Step 2 –
With the help of WINSCP copy downloaded PAK files to below VROPS’s server location
$STORAGE/db/casa/pak/dist_pak_files/VA_Linux (because it is a virtual appliance)
Step 3 –
Expose the ID of the PAK file by entering the following command
$VMWARE_PYTHON_BIN {path}/vcopsPakManager.py --action=query_pak_id --pak={pak-filename}
For example –
## /usr/lib/vmware-vcopssuite/utilities/pakManager/bin/vcopsPak Manager.py is location of Python script.
It will give the “PAK_ID” as shown above
Step 4 –
Rename the PAK file so the PAK ID become the base filename
For example -
mv vRealize_Operations_Manager-VA-6.1.0.2733055.pak vRealizeOperationsManagerEnterprise-6102733055.pak
Step 5 -
Enter the following command to verify that the PAK file was correctly copied to the node and renamed:
For example -
sha1sum vRealizeOperationsManagerEnterprise-6616163041.pak
Refer to below image
Now, Once all the files are copied, take the snapshot. You can follow my this post or let me know if you want this engine.
Please be cautious while taking the snapshot for below two points
- Uncheck Snapshot the Virtual Machine Memory
- Uncheck the Ensure Quiesce Guest File System (Needs VMware Tools installed)
Below is the reference VMware’s KB
https://docs.vmware.com/en/vRealize-Operations-Manager/6.5/com.vmware.vcom.core.doc/GUID-42502543-2451-4317-BA42-F7D12172C23B.html
Pre-staging of PAK file is done here. Now let's proceed for the actual upgrade.
We will do this upgrade in two phases. So...
Phase 1 – VRealize Operation Manager OS Upgrade
Login to vRealize Operations Manager Admin Console using https://<masternode -IP-address or FQDN name>/admin. You will see below console.
Once Snapshots for all nodes including master nodes are done then click on “Take offline” button as shown above in snippet.
It will bring cluster offline and vROPS user interface will be inaccessible from now. You will see below status of the cluster.
Now click on Software Update under Administration panel and then click on “Install a Software Update”
Browse and select the OS Upgrade PAK file (vRealize_Operations_Manager-VA-OS-6.6.1.6163041.pak) which you downloaded to C:\Temp location then click on Upload
Once Upload completed, click on Next and then Accept EULA and Click on Next again.
Click on Install button to start the upgradation as shown in below image.
Now you will see below console on Admin interface.
It will take some time to complete the installation. Once OS update will be complete, Cluster status will be in online state.
Note: Version is not upgraded after this PAK file.
Now OS Upgrade has been completed. Now move to upgrade Virtual Appliance
Once VROPS OS PAK file will be installed cluster will back online automatically.
Phase 2 – VROPS Virtual Appliance Upgrade
After OS upgrade completed, login admin interface of VROPS as usual and click on install a software update as we done before.
This time upload virtual appliance pak file (vRealize_Operations_Manager-VA-6.6.1.6163041.pak)
And follow the wizard same as followed in previous steps.
When you will click on Install button to start the VA upgrade it will show you below information. Don't be afraid of below message
After this warning admin and UI interfaces will be unavailable for next few minutes as in below snippet. This can happen that your UI portal will be unavailable for some time.
After few minutes try F5 or refresh button to have the VROPS admin login interface again.
Once it comes up again, login to admin interface and you will have different HTML5 splash window like below one
Now login to admin portal and you will find that installation is still in progress.
Once all steps will be completed, you will see below results.
Now go to System status tab and you should find that all nodes are back online and cluster also is online and running fine with new version as shown in below image
You are done!
Any doubt, feel shameless to write the comment.
Thank you,
vCloudNotes